BuildForce Armed Forces Project Day with HS2 Joint Venture Balfour Beatty VINCI Systra (BBVS)

BuildForce is delighted to be hosting a unique event with Balfour Beatty VINCI SYSTRA (BBVS JV) on the HS2 Project at Old Oak Common station, London.

BBVS JV is delivering the new HS2 station in Old Oak Common. Balfour Beatty’s expertise in constructing critical major transport terminals across the world will combine with VINCI’s knowledge in constructing high-speed lines and UK rail infrastructure projects, and SYSTRA’s expertise in designing, integrating and project managing the delivery of rail systems, stations and wider transport and infrastructure projects.

This new super-hub is set to be the best connected and largest new railway station in the UK. The station will have fourteen platforms, a mix of six high-speed and eight conventional service platforms, with an 850-meter-long station box. It is expected to be one of the busiest railway stations in the country with high-speed rail services to the Midlands and access to central London and Heathrow via the Elizabeth line. Its construction and operation will also drive the regeneration of the area around it in West London.

This is a fantastic opportunity for a site visit of Old Oak Common, to meet the team and explore the breadth of job opportunities on the project, such as project management, site management, logistics, engineering, design, quantity surveying, health and safety, quality, sustainability, operative roles, etc.

Agenda for the day:

1300 – 1400: Registration & PPE (please bring your own steel toe-capped boots – all other PPE provided)

1400 – 1430: Welcome note

1430 – 1530: Old Oak Common site tour

1530 – 1700: 1-2-1 employer / project engagement sessions

1700 – 1730: Closing note

Register at: BuildForce Armed Forces Project Day, HS2 JV Balfour Beatty VINCI Systra

 

Date

Apr 24 2024
Expired!

Time

1:00 pm - 5:30 pm

Comments are closed.